| S
N
o |
Client
Name & Address |
Details
Of Work |
Period |
Amount
Kuwaiti Dinars
(MILLIONS) |
| 1 |
Mitsubishi
Heavy Industries Ltd., Takasago Machinery Works 1-1, Shinhama,
2-Chome, Araicho, Takasagoa Hyogo, Pref. Japan. |
Erection
of Turbines Generators, Piping, Machinery & Equipments,
Commissioning & Operation Activities, Electrical &
Instrumentation Works of 8x300 MW |
1981
- 1986 |
1.1
|
| 2 |
Mitsubishi
Heavy Industries Ltd.,
1-1 Akunoura Machi
Nagasaki 850-91, Japan
Tel: 61-2111 |
Erection
of Piping, Assembly & Erection of Air Heaters. Erection
of Emergency DG, Painting, Insulation of 8x300 MW at Al-Zour
South Power Stn.
|
1984
- 1990 |
0.9
|
| 3 |
Mitsubishi
Heavy Industries Ltd., 15-1 Tomihisa-Chom Shinjukuku, Tokyo,
Japan. Tlx: J24612
|
Piping
work, guarantee maintenance and outstanding work for Distillation
Plant, Stage II at Doha west
|
1983
- 1987 |
0.4
|
| 4 |
Consortium
of Mitsubishi Heavy Industries Ltd., and Mitsubishi Corporation,
1-1, shinhama 2-Chome, Takasgo Hyogo Pref., Japan.
|
General
construction work, Equipment Rental, Transportation, Piping
Erection, Machinery & Equipment Installation & Electrical
Works at Al-Zour Gas Turbine Project, Kuwait
|
1986
- 1990 |
1.2
|
| 5 |
Mitsubishi
Heavy Industries Ltd., 1-1 Akunoura Machi Nagasaki 850-91,
Japan Tel: 61-2111
|
Execution
of Maintenance works of Boiler Units at Al-Zour South Power
Station, Kuwait. (Guarantee Maintenance)
|
1989
- 1998 |
0.65
|
| 6 |
MHI-Sasakura
Consortium, C/o. Mitsui & Co. Ltd., Overseas Project
Dept., 2-1, Chtamachi, 1-Chome, Chiyoda-KU, Tokyo, Japan.
|
Erection
of Piping, Equipments and Electrical & Instrument work
Guarantee maintenance and Outstanding work at Al-Zour South
Distillation Project.
|
1986
- 1990 |
1.4
|
| 7 |
Hitachi
Ltd., Japan
|
Erection
& Installation of Doha East Gas Turbine Power Plant
(100 MW) Kuwait, in various fields like Piping, Equipment
Erection, Electrical, Instrumentation & assistance in
commissioning.
|
1980
- 1982 |
0.6
|
| 8 |
Babcock-Hitachi
Ltd., Through Takada Industries Ltd., 1-1 Tsukijimachi Yahata-nishi-ku
Kitakyushu-shi, Fukuoka 806, Japan. Tel: 093)632-2531
|
Erection
and Installation of Piping, Mechanical & Electrical
Equipments of 3 Units of Water Desalination Project at Shuwaikh,
Kuwait.
|
1978
- 1980 |
0.6
|
| 9 |
JV
of Hitachi & Nissei Sangyo Telex: J22412 NISEICOA C.P.O.
Box 1316 TOKYO 100-91 Japan Tel: 03-504-711
|
Heating,
Ventilation & Air Conditioning System at Al-zour South
Power Station, Project, Kuwait.
|
1988-1990 |
0.2
|
| 10 |
Sasakura
Engineering Co. Ltd., 7-5 Mitejima 6-Chome, Nishiyodogawa-Ku,
Osaka 555, Japan. Tel: Osaka(06)473-2131
|
Operation
work of Al-Zour South Distillation Project, Kuwait.
|
1989 |
0.08
|
| 11 |
Petrogas
Gas Systems, Doesburgweg 7, 2803 PL GOUDA The Netherlands.
Tel: (311)-1820-65395
|
Erection
& Installation of Mechanical & Electrical parts
of scrubbers & pressure reducing stations of Al-Zour
Power & Gas Turbine Stations. Kuwait, in various fields
like Piping, Equipment Erection , Electrical works.
|
1989
- 1990 |
0.05
|
| 12 |
Lentjes, Post Box No.8306, Salmiya-22054, Kuwait. Tel:5652783
|
Boiler
renovation work at Shuaiba South Power Station at Kuwait.
|
1992
- 1993 |
0.06
|
| 13 |
Babcock
- Deutsche Post Box 26401,Safat - 13125,
|
Maintenance
works of Steam Generators & Auxilaries at Doha West
Power Station.
|
1992
- 1993 |
0.04
|
| 14 |
Ansaldo
A.M.N. & Regiani Co.
|
Erection
and Installation of Piping, Mechanical & Electrical
Equipments & Instrumentation work of 4 Units of Water
Desalination Project at Doha West, Kuwait.
|
1980
- 1983 |
1.2
|
| 15 |
Filippo
Fochi Post Box No. 27310, Safat, Kuwait.
|
Erection
of Piping of Desalter Phase IV Project (K.O.C) in Burgan
and reconstruction of Tank Farm at Doha East Project.
|
1993
- 1994 |
0.5
|
| 16 |
Daelim
Engineering Co., Korea |
Maintenance
works at Mina Ahmadi and Shuaiba Refinery |
1993 |
0.04
|
| 17 |
Mitsubishi
Electric Corporation 2-2, Marunouchi 12-Chome, Chiyoda-Ku,
Tokyo, 100, Japan. Tel: (03)218-2111
|
Installation
of Indoor Switch Gear, Transformer, Control Panels and other
Electrical Equipments of 300/45 KV Substation for Doha West
Power Station, Kuwait. (8x300 MW TG &Auxiliaries)
|
1981
- 1984 |
0.45
|
| 18 |
Mitsubishi
Electric Corporation 2-3, Marunouchi 2-Chome, Chiyoda-KU,
Tokyo, 100 Japan. Tel: (03) 218-2111
|
Complete
Installation & Commissioning of 300 to 132/33/11KV Electrical
Substations at 49 various places & 1 No. D.C.C. Project
in Kuwait.
|
1978
- 1994 |
3.0
|
| 19 |
Hitachi
Ltd., Post Box No. 24168, Safat - 13102 Kuwait. Tel: 2418262
|
Complete
Installation & Commissioning of 300 to 132/33/11 KV
Electrical Sub Stations at 45 various places in Kuwait.
|
1976
- 1989 |
2.5
|
| 20 |
Cogelex
Alsthom Kuwait Office, Post Box No. 23540, Safat-13096,
Kuwait.
|
Complete
Installation of 300 to 132/33/11 KV Electrical Substation
at 30 various places in Kuwait.
|
1977
-1994 |
1.6
|
| 21 |
Asea
Brown Boveri, Kuwait Project Post Box No. 20945, 13070,
Safat, Kuwait. Tel:242826
|
Complete
Installation of 300 to 132/33/11 KV Electrical Substation
at 30 various places in Kuwait. 20 various places in Kuwait.
|
1980
- 1994 |
1.7
|
| 22 |
Sprecher
+ Schuh Ltd., Post Box No. 25459 Safat, Kuwait.
|
Complete
Installation of 300 to 132/33/11 KV Electrical Substations
at 9 various places in Kuwait.
|
1983
- 1985 |
0.8
|
| 23 |
Techno
Impex, Post Box No.36736, Al-Rass 24758, Kuwait
|
Complete
Installation of 132/11 KV Electrical Substations at 3 various
places in Kuwait. |
1993
-1994 |
0.15
|
| 24 |
Shimizu
Construction Co. Ltd., No. 16-1, Kyobashi 2-Chome, Chuo-ku,
Tokyo, Japan. Tel: 535-4111
|
Outdoor
Electrical Installation of Street Lights, Lighting poles,Cabling
and Civil works of Al-Zour South Power Station-8x300MW
|
1984
- 1990 |
0.9
|
| 25 |
China
Petroleum Construction Corp. China.
|
Assistance
with Manpower & Equipment at Mina Ahmadi Refinery.
|
1993 |
0.06
|
| 26 |
Spic/Integral
Services Post Box No. 3683 Salmiya - 22037, Kuwait. Tel:
5735576
|
Mechanical
Maintenance job at Mina Abdullah Refinery.
|
1992
-1994 |
0.03
|
| 27 |
Khalifa
Daij Al-Dabbous & Bros & Partners. Al-Murgab, Near
Ministries Complex, Kuwait. Tel: 2463097/2453582
|
Mechanical
Maintenance for the P.I.C. at Shuaiba & Periodical Maintenance
at P.I.C. Shuaiba.
|
1994 |
0.02
|
| 28 |
Carter
Building Engineering Service Ltd., Red Hill Road, Hay Hills,
Birmingham B25 BEY Tel: 021-7724300
|
Installation
of 8 kms. Underground ductile Iron Pipe Work, Pump Stations
(4 Nos.) for Al-Sabah Health Area project, Kuwait.
|
1992
-1994 |
0.009
|
| 29 |
Gulf
International Co., Fintas, Kuwait.
|
K.A.F.(Air
Base Subhan Project Under Ministry of Defence)
|
1992 |
0.01
|
| 30 |
Al-Bahar
Jacorossi, Kuwait.
|
Assisting
with supply of Manpower for the Erection work of Re-carbonation
Plant at Al-Zour South & Doha West Power Stations-8x300MW
|
1995 |
0.09
|
| 31 |
Mitsubishi
Electric Corp., 2-2, Marunouchi 12-Chome, Chiyoda-ku, Tokyo,
100, Japan. Tel: (03) 218-2111
|
Demolition
of 132/11 KV Electrical Substations at South Sabah Al-Salem
'A', 'D' & 'E'
|
1994 |
0.05
|
| 32 |
ABB
HV Switchgear AB Sub Station Division, Kuwait Contracts
|
Demolition
of 132/33/11 Khaitan "A" Substation. |
1992 |
0.02
|
| 33 |
Mitsubishi
Electric Corp., 2-2, Marunouchi 12-Chome, Chiyoda-ku, Tokyo,
100, Japan Tel: (03) 218-2111
|
Installation
of 132/11KV Substations at South Sabah Al-Salem 'A', 'D'
& 'E'
|
1994
-1995 |
0.34
|
| 34 |
Mitsubishi
Heavy Industries Ltd., Nagasaki Shipyard & Machinery
Works 1-1, Akunoura Machi, Nagasaki, Japan.
|
Temporary
Facilities (Office & Warehouse) for Kuwait Sabiya Thermal
Power Plant Project-8x300MW
|
1995 |
0.3
|
| 35 |
Mitsubishi
Heavy Ind.Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan
|
Preceding
Electrical (Embedded) works for Sabiya Power station in
Kuwait-8x300MW
|
1995 |
0.05
|
| 36 |
Mitsubishi
Heavy Ind.Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan
Nagasaki 850-91, Japan
|
Execution
of maintenance work of Boiler units at Al-Zour South Power
Station -8x300MW (Guarantee Maintenance).
|
1989
- 1990
1991 - 1998 |
1.5
|
| 37 |
Mitsubishi
Heavy Ind.Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan
|
Erection
Work of Common Facility for Sabiya Power Station -8x300MW
(Rotating & Static Equipment, Piping, Tanks/Vessels
etc.) {including additional Works}
|
1997
-2001 |
0.5
|
| 38 |
Mitsubishi
Heavy Ind.Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan
|
Erection
Work of Fuel Gas Piping & Fuel Gas Scrubber for Sabiya
Power Station 8x300MW (including additional Works)
|
1997
1999 |
0.2
|
| 39 |
Mitsubishi
Heavy Ind.Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan
|
Pre
Setting Works for Sabiya Power Station-Erection of heavy
Equipment-8x300MW (Static & Rotary) (Including additional
Works)
|
1996
- 2000 |
0.5
|
| 40 |
Mitsubishi
Heavy Ind.Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan
|
Electrical
& Instrumentation Works-Installation, testing &
Commissioning at Sabiya Power Station Project, Kuwait-8x300MW
(including additional Works)
|
1996
-2001 |
0.67
|
| 41 |
Mitsubishi
Electric Corporation Post Box No. 2707, Salmiya - 22028,
Kuwait
|
300
KV SF6 Substation Erection Works at Sabiya Power Station
Project, Kuwait.
|
1996
- 1998 |
0.37
|
| 42 |
Mitsubishi
Electric Corporation Post Box No. 2707, Salmiya - 22028,
Kuwait Salmiya - 22028, Kuwait
|
Preventive
& Light Maintenance Works of 300, 132/11 KV Substations
at various places in Kuwait.
|
1998
(cont) |
0.75
|
| 43 |
Hitachi
Ltd., 13F, Al-Khartrash & Mishari Complex Fahd Al-Salem
Street, Kuwait.
|
Installation
of 300 MVA Power Transformer & Shunt Reactor at Fintas
"W" Substation
|
1998
|
0.06
|
| 44 |
Mitsubishi
Heavy Ind. Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan
|
Erection
Works of Reverse Osmosis Plant at Sabiya Power Station,
Kuwait-8x300MW
|
1999
-2000 |
0.05 |
| 45 |
Kuwait
Oil Company Kuwait.
|
Replacement
of corroded Lines at Desalter trains 1A &1B at GC1-15
in North Kuwait. (Contract No. 98B210)
|
1998
- 1999 |
0.02
|
| 46 |
Mitsubishi
Heavy Ind.Ltd., 1-1, Akunoura Machi Nagasaki 850-91, Japan.
|
Erection
works and Guarantee maintenance Works of Boilers/Turbine
& accessories of 8*300 MW Sabiya Power Station Project
- assist with Manpower & Constrn.Equipments
|
1996
- 2001 |
3.5
|
| 47 |
Kuwait
Oil Company
Kuwait. |
Replacement
of Vertical Separators
with Horizontal at GC - 1
(Contract No. 99G030)
|
1999
- 2000 |
0.07
|
| 48 |
Kuwait
Oil Company
Kuwait.
|
Construction
of Flow Lines and associated Works |
|
7.5 |
| 49 |
Kuwait
Oil Company
Kuwait. |
Upgrade/Modification
of Wet Oil
& Gas Separator Train at GC - 10
(Contract No.99G049)
|
2000
- 2001 |
0.15
|
| 50 |
Bait
Al-Zakat
Independent Govt. Authority
Kuwait.
|
Construction
of Admin. Building at
Dahiya Abdullah Salem
|
2000 |
0.03
|
| 51 |
Abdul
Aziz Yusuf Al-Essa & Co.,
Kuwait.
|
Construction
of New GC-25 at
North Kuwait- Assist with Manpower
and Construction Equipment.
|
1999
- 2000 |
0.25
|
| 52 |
The
Public Authority for
Applied Education & Training,
State of Kuwait.
|
Construction
of Waiting Rooms & extension of
Cafeteria
|
1999
- 2000 |
0.08
|
| 53 |
Doosan
Heavy Industries Ltd., Kuwait |
Construction
of Al-Zour South Distillation Project (Stage 3) -assist
with Manpower &Constrn. Equipment, Lump sum Jobs for
Site Office/Ware house Facilities, Electrical Lighting Works.
|
1999
- 2001 |
0.5
|
| 54 |
Kuwait
Oil Company Kuwait.
|
Replacement
of Waste Water Line Segments in GC's 1,3,4,6,8,21(Contract
No. 10614)
|
2001
- 2002 |
0.07
|
| 55 |
Kuwait
Oil Company Kuwait.
|
Replacement
of MOV's in South Tank Farm Loading Manifold &Crude
Pump House(Contract No. 11010) |
2001
- 2002(Cont.) |
0.045 |
| 56 |
Public
Authority for housing Welfare |
Maintenance
for renovation for the Umm-Al-Haiman Clinic Center
|
2000
- 2001 |
0.4 |
| 57 |
LG
Engg. & Constr. Corporation Seoul, Korea
|
Construction
of New GOD Project at Mina Al-Ahmadi Refinery- assist with
manpower, Construction Equipment, Materials.
|
2001
- 2002 |
2.0
|
| 58 |
Hyundai
Engg. & Construction Co. Ltd., Korea.
|
Construction
of Kuwait New Oil Pier Project at Mina Al-Ahmadi, Kuwait-
Assisting with Manpower & Construction Equipment, materials.
|
2001-(Cont.) |
2.0
|
| 59 |
SK
Engg. & Construction Co. Ltd., Korea
|
Restoration
Project at Mina Al-Ahmadi, Kuwait- assisting with Manpower
& Construction Equipment
|
2001-(Cont..) |
1.4
|
| 60 |
Ministry
of Information, Kuwait
|
Working
with M/s.Gulf Europe Construction
of New Office Bldg.
|
2002 |
0.10
|
| 61 |
Ministry
of Health, Kuwait.
|
Working
with M/s.Gulf Europe Construction
of New Office Bldg. |
2002 |
0.10
|
| 62 |
LG
Engineering & Construction Corp. Seoul, Korea
|
Shut
down and Modification Works at Kuwait New GOD Project at
MAA Refinery |
2002 |
0.005
|
| 63 |
Mitsubishi
Heavy Industries Ltd.
|
Assisting
with Manpower & Equipment for Guarantee Maintenance
works of Boilers & Turbines of 8 x 300 MW, Sabiya Power
Station Project, Kuwait.
|
2001
- 2003 |
0.35
|
| 64 |
Mitsubishi
Heavy Industries Ltd. 1-1, Akunoura Machi Nagasaki 850-91,
Japan
|
Guarantee
Maintenance works of Auxiliary equipment of 8 x 300MW Sabiya
Power Station Project, Kuwait.
|
2001
- 2003 |
0.24
|
| 65 |
Al-Ghanim
Combined Group
Kuwait.
|
Execution
of various jobs order
Contracts for US Army.
|
2003
- 2007 |
0.35
|
| 66 |
Middle
East Electric Co., Kuwait.
|
Annual
Preventive & Light Maintenance of
Electrical Substations for 5 years.
|
2003
- 2008 |
0.59
|
| 67 |
LG
Engineering & Construction Co., Korea. |
OCR
Revamp of ARDS Unit at Mina Abdulla Refinery- Assist with
Manpower, Construction Equipment and Materials.
|
2003-2005 |
1.00
|
| 68 |
Mohd.
Abdul Rahman Al-Bahar & Co., Kuwait. |
Elecrical
& Civil Works at various locations in Kuwait.
|
2003
- 2005 |
0.08
|
| 69 |
SK
Engineering and Construction Co. Ltd, Seoul, Korea
|
Rebuilding
Project of GC-15 and BS-131 at North Kuwait, KOC
|
2003
- 2005 |
0.3
|
| 70 |
The
National Co. for Mechanical & Electrical works (Kharafi
National)
|
Renovation
of Bldg # 5 & 6, Electrical and Fire Alarm Works
|
2003
- 2004 |
0.15
|
| 71 |
US
ARMY, Camp Arifjan and Camp Doha
|
Electrical
& Communication Construction work
|
2003
- 2004 |
0.02
|
| 72 |
The
National Co. for Mechanical & Electrical works (Kharafi
National)
|
Hire
of Construction Equipment for their various projects in
Kuwait as well as Iraq
|
2003-2004 |
0.18
|
| 73 |
Army
& Air Force Exchange Services, 3911 South Walton Walker,
Dallas, USA |
Hire
of Admin. & Tech. Services for their Arif Jan Camp market
on Kuwait |
2003-2005 |
US$183,000
|